
-
ClientMAJOR EVENT PROVIDER
-
Duration1 DAY
-
Project typePEDESTRIAN MANAGEMENT & EVENT TM
Introduction
Insight Traffic Solutions was contracted to provide traffic management services for a major event in Cleethorpes, held on 12th May 2024. The project required a timely and efficient setup of traffic management, including the placement of 45 barriers along Meridian Road to ensure the safety and smooth flow of participants and the general public. The project was completed successfully, with positive feedback received from both the client and the event organisers.
Result
The major event on 12th May 2024 was a successful operation for Insight Traffic Solutions. The project was completed on time, with all traffic management measures in place as required. The positive feedback from the client serves as a testament to the effective planning, execution, and professionalism displayed by the team.
This case study illustrates the importance of detailed planning, timely execution, and responsive on-site management in delivering successful traffic management services for major events.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Project Team

Name

Name
